Agrader will be used to prepare the road prior to concrete paving. the work will require the following: two passes in first gear to remove ruts. two passes in second gear to level the road. three passes fourth gear to shape the road. -efficiency factor is 75%. forward gears maximum travel speed (mph) first second third fouth 2.1 3.6 4.4 6.7 a. estimate the total time requirement for this task.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15Β°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
You know the right answer?
Agrader will be used to prepare the road prior to concrete paving. the work will require the followi...
Questions
question
Mathematics, 05.05.2020 15:57
question
Mathematics, 05.05.2020 15:57
question
Mathematics, 05.05.2020 15:57
Questions on the website: 13722361