Engineering, 28.11.2019 03:31 joshblubaugh

The project site will require clearing and grubbing prior to beginning earthwork operations. to select the appropriate dozer, the following should be considered: - there are both 335-hp and 460-hp dozers available - the site to be cleared is 75’ wide by 3/4 of a mile long. - the site is generally level and poses no traction problems for the equipment. - 60% of the trees are pines, 40% are oak - the total number of trees per acre is about 300; of those: - 140 trees per acre are 1 to 2 ft in diameter - 50 trees per acre are 2 to 3 ft in diameter. - 35 trees per acre are 3 to 4 ft in diameter. - the current plan is to clear and grub in one operation, and then follow with piling-up in windrows and burning. part 1 - identify which dozer, or combination of dozers, provides the best production rate.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
question
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
You know the right answer?
The project site will require clearing and grubbing prior to beginning earthwork operations. to sele...
Questions
question
Biology, 07.03.2021 03:10
question
Mathematics, 07.03.2021 03:10
Questions on the website: 13722360