subject
Engineering, 28.11.2019 06:31 samm2002

One or more parties may terminate an agency relationship by placing into the agreement a time period for termination. when that time , the agency ends. in addition, the parties can specify that the agency is for a particular . once that is achieved, the agency ends. alternatively, the parties can include a specific event as a trigger for termination; once that event , the agency ends. the parties can terminate an agency relationship prior to any of the preceding events by agreement, or revocation by individual party. g

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
You know the right answer?
One or more parties may terminate an agency relationship by placing into the agreement a time period...
Questions
question
History, 25.07.2019 18:50
question
Computers and Technology, 25.07.2019 19:00
Questions on the website: 13722361