subject
Engineering, 29.11.2019 03:31 BigI80531

Awatershed with an area of 350 square miles experienced a 3-hr storm that had an intensity of 1.75 in/hr. what is your estimate of the total volume of water that fell over the entire watershed in acre-ft? (1 acre = 43560 ft2 ; 1 mile = 5280 ft). [5]

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:20
Agas mixture consists of 8 kmol of h2 and 2 kmol of n2. determine the mass of each gas and the apparent gas constant of the mixture.
Answers: 3
You know the right answer?
Awatershed with an area of 350 square miles experienced a 3-hr storm that had an intensity of 1.75 i...
Questions
question
Mathematics, 04.09.2020 19:01
question
Health, 04.09.2020 19:01
question
SAT, 04.09.2020 19:01
question
Computers and Technology, 04.09.2020 19:01
Questions on the website: 13722360