Acertain job shop specializes in one-of-a-kind orders dealing with parts of medium-to-high complexity. a typical part is processed sequentially through 10 machines in batch sizes of one. the shop contains a total of eight conventional machine tools and operates 35 hours per week of production time. the machine tools are interchangeable in the sense that they can be set up for any operation required on any of the parts. average time values on the part are: machining time per machine = 0.5 hour, work handling time per machine = 0.3 hour, tool change time per machine = 0.2 hours, setup time per machine = 6 hours, and non-operation time per machine = 12 hours. a new programmable machine has been purchased by the shop that is capable of performing all ten operations in a single setup. the programming of the machine for this part will require 20 hours; however, the programming can be done offline, without tying up the machine. the setup time will be 10 hours. the total machining time will be reduced to 80% of its previous value due to advanced tool control algorithms; the work handling time will be the same as for one machine; and the total tool change time will be reduced by 50% because it will be accomplished automatically under program control. for the one machine, non-operation time is expected to be 12 hours.
explain how the variables used in the equations are found.
(a) determine the manufacturing lead time for the traditional method and for the new method.
(b) compute the plant capacity for the following alternatives: (i) a job shop containing the eight traditional machines and (ii) a job shop containing two of the new programmable machines. assume the typical jobs are represented by the data given above.
(c) determine the average level of work-in-process for the two alternatives in part (b), if the alternative shops operate at full capacity.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
question
Engineering, 04.07.2019 18:10
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
Refrigerant 134a enters an insulated compressor operating at steady state as saturated vapor at -26°c with a volumetric flow rate of 0.18 m3/s. refrigerant exits at 9 bar, 70°c. changes in kinetic and potential energy from inlet to exit can be ignored. determine the volumetric flow rate at the exit, in m3/s, and the compressor power, in kw.
Answers: 1
You know the right answer?
Acertain job shop specializes in one-of-a-kind orders dealing with parts of medium-to-high complexit...
Questions
question
Arts, 14.01.2021 19:10
question
Mathematics, 14.01.2021 19:10
question
Mathematics, 14.01.2021 19:10
question
Mathematics, 14.01.2021 19:10
question
Mathematics, 14.01.2021 19:10
question
English, 14.01.2021 19:10
Questions on the website: 13722367