Engineering, 11.12.2019 18:31 elias1019
A60 hz, 120 vrms generator is connected to a load that consumes 30kw of power at a power factor of cos(45) lagging. a capacitor is placed in parallel with the load to improve the power factor to cos(30) lagging. the reactive power without the capacitor is qold = 30kvar and with the capacitor qnew=17.32kvar. what is the value of c?
options:
-35 mf
-14.7 mf
-2.3 mf
0 mf
2.3 mf
14.7 mf
35 mf
Answers: 3
Engineering, 03.07.2019 14:10
Amass of 1.5 kg of air at 120 kpa and 24°c is contained in a gas-tight, frictionless piston-cylinder device. the air is now compressed to a final pressure of 720 kpa. during the process, heat is transferred from the air such that the temperature inside the cylinder remains constant. calculate the boundary work input during this process.
Answers: 2
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
A60 hz, 120 vrms generator is connected to a load that consumes 30kw of power at a power factor of c...
Mathematics, 17.09.2021 14:00
Physics, 17.09.2021 14:00
Mathematics, 17.09.2021 14:00
Health, 17.09.2021 14:00
Mathematics, 17.09.2021 14:00
Mathematics, 17.09.2021 14:00
History, 17.09.2021 14:00
English, 17.09.2021 14:00
History, 17.09.2021 14:00
History, 17.09.2021 14:00