subject
Engineering, 12.12.2019 01:31 nestergurl101

create a first draft of a wbs from the following scenario. make assumptions as needed based on the section about project planning considerations and constraints in this chapter. in your wbs, describe the skill sets required for the tasks you have planned.

sequential label and supply has a problem with employees surfing the web to access material the company deems inappropriate for a professional environment. therefore, sls wants to insert a filtering device in the company internet connection that blocks certain web locations and content. according to the vendor, the filter is a hardware appliance that costs $18,000 and requires 150 hours to install and configure. technical support for the filter costs 18 percent of the purchase price and includes a training allowance for the year. a software component that runs on the administrator’s desktop computer is needed to administer the filter; this component costs $550. a monthly subscription provides the list of sites to be blocked and costs $250 per month. an estimated four hours per week are required for administrative functions.

you should consider the following items:

• your plan requires two parts: one for deployment and another for ongoing operation after implementation.

• the vendor offers a contracting service for installation at $140 per hour.

• your change control process requires a 17-day lead time for change requests.

• the manufacturer has a 14-day order time and a seven-day delivery time for this device.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Amass of m 1.5 kg of steam is contained in a closed rigid container. initially the pressure and temperature of the steam are: p 1.5 mpa and t 240°c (superheated state), respectively. then the temperature drops to t2= 100°c as the result of heat transfer to the surroundings. determine: a) quality of the steam at the end of the process, b) heat transfer with the surroundings. for: p1.5 mpa and t 240°c: enthalpy of superheated vapour is 2900 kj/kg, specific volume of superheated vapour is 0. 1483 m/kg, while for t 100°c: enthalpy of saturated liquid water is 419kj/kg, specific volume of saturated liquid water is 0.001043m/kg, enthalpy of saturated vapour is 2676 kj/kg, specific volume of saturated vapour is 1.672 m/kg and pressure is 0.1 mpa.
Answers: 3
question
Engineering, 04.07.2019 18:10
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 19:10
The short distance from the objective lens to the object causes problems at high magnification. which of the following is the most serious? a. cleaning the object surface b. positioning the object c. reflection from the object surface. d. illumination of the object
Answers: 1
You know the right answer?
create a first draft of a wbs from the following scenario. make assumptions as needed based on the s...
Questions
question
Mathematics, 25.09.2019 23:40
question
Mathematics, 25.09.2019 23:40
question
Social Studies, 25.09.2019 23:40
question
Mathematics, 25.09.2019 23:40
question
Mathematics, 25.09.2019 23:40
Questions on the website: 13722367