Engineering, 16.12.2019 22:31 queenkimm26

An incentive plan employing a kicker is in use. below standard performance the worker is guaranteed a rate of $6 per hour and above standard performance the worker is paid $9.20 per hour.

a job is studied and a rate of 0.036 hours per piece is set.

what is the direct labor cost per piece at the following efficiencies:
a. 50 percent?
b. 80 percent?
c. 98 percent?
d. 105 percent?
e. 150 percent?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 23:20
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
An incentive plan employing a kicker is in use. below standard performance the worker is guaranteed...
Questions
question
Social Studies, 02.04.2020 07:05
question
Mathematics, 02.04.2020 07:05
question
English, 02.04.2020 07:05
question
Business, 02.04.2020 07:05
question
Mathematics, 02.04.2020 07:05
Questions on the website: 13722361