Water is drawn into the pump, such that the pressure at the inlet a is 35 kpa and the pressure at b is 120 kpa. if the discharge at b is 0.08 m3/s, determine the power output of the pump. neglect friction losses. the pipe has a constant diameter of 100 mm. take h = 2 m.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Ahe-xe mixture containing a 0.75 mole fraction of helium is used for cooling electronics in an avionics application. at a temperature of 300 k and atmospheric pressure, calculate the mass fraction of helium and the mass density, molar concentration and molecular weight of the mixture. if the cooling capacity is 10 l, what is the mass of the coolant?
Answers: 3
question
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
question
Engineering, 04.07.2019 19:10
Afoot bridge is made as a simple deck, 4 m long, with a cross section 2 m (wide) and 20 cm thick, and made of wood. the deck is supported at the two ends. the maximum load allowable on the bridge is 10 tons, provided it is uniformly distributed on the deck. to sense this load, a strain gauge is placed at the center of the bridge and its resistance is monitored. if the sensor has a nominal resistance of 350 s2 and a gauge factor of 3.6, what is the reading of the strain gauge at maximum load? the modulus of elasticity for the wood used in the construction is 10 gpa.
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?