subject
Engineering, 19.12.2019 09:31 hemolelekeakua

To employees for installing aluminum siding on a farm house when it became necessary to remove a 36 foot high metal pole cbn tenna when placed in a new metal pick a board between two letters in invested in the internet at the top of the house the other employee who is standing on the ground to the internet to lay down in the yard antenna made electrical contact with a 77,200 v power transmission line 30 feet and 10 inches from the house and 23’9”

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:20
Air is compressed isentropically from an initial state of 300 k and 101 kpa to a final temperature of 1000 k. determine the final pressure using the following approaches: (a) approximate analysis (using properties at the average temperature) (b) exact analysis
Answers: 1
question
Engineering, 04.07.2019 19:10
Asteam is contained in a rigid tank with a volume of 1 m3. initially, the pressure and temperature are 7 bar and 500 oc, respectively. the temperature drops due to cooling process. determine: (1) the temperature at which condensation begins in Β°c, (2) the fraction of the total mass that has condensed when the pressure decreased to 0.5 bar. (3) the volume in m3 occupied by saturated liquid at the final state?
Answers: 3
You know the right answer?
To employees for installing aluminum siding on a farm house when it became necessary to remove a 36...
Questions
question
Mathematics, 08.10.2021 01:30
Questions on the website: 13722361