subject
Engineering, 20.12.2019 04:31 jessieeverett432

Apre-timed four-timing-stage signal has critical lane group flow rates for the first three timing stages of 200, 187, and 210 veh/h (saturation flow rates are 1800 veh/h/ln for all timing stages). the lost time is known to be 4 seconds for each timing stage. if the cycle length is 60 seconds, what is the estimated effective green time of the fourth timing stage?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:10
Fluids at rest possess no flow energy. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
You know the right answer?
Apre-timed four-timing-stage signal has critical lane group flow rates for the first three timing st...
Questions
question
Mathematics, 09.12.2020 02:10
question
Mathematics, 09.12.2020 02:10
question
History, 09.12.2020 02:10
question
Mathematics, 09.12.2020 02:10
question
History, 09.12.2020 02:10
Questions on the website: 13722360