subject
Engineering, 21.12.2019 01:31 jjhagan22

Consider a cmos inverter fabricated in a 65-nm cmos process for which vdd =1v, vtn =−vtp =0.35 v, and μncox =2.5μpcox =470 μa/v2. in addition, qn and qp have l = 65nm and(w/l)n =1.5.

(a) find wp that results in vm =vdd/2. what is the silicon area utilized by the inverter in this case?
(b) for the matched case in(a), find the values of voh, vol, vih, vil, nml, and nmh.
(c) for the matched case in (a), find the output resistance of the inverter in each of its two states.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Amass of m 1.5 kg of steam is contained in a closed rigid container. initially the pressure and temperature of the steam are: p 1.5 mpa and t 240°c (superheated state), respectively. then the temperature drops to t2= 100°c as the result of heat transfer to the surroundings. determine: a) quality of the steam at the end of the process, b) heat transfer with the surroundings. for: p1.5 mpa and t 240°c: enthalpy of superheated vapour is 2900 kj/kg, specific volume of superheated vapour is 0. 1483 m/kg, while for t 100°c: enthalpy of saturated liquid water is 419kj/kg, specific volume of saturated liquid water is 0.001043m/kg, enthalpy of saturated vapour is 2676 kj/kg, specific volume of saturated vapour is 1.672 m/kg and pressure is 0.1 mpa.
Answers: 3
question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
question
Engineering, 04.07.2019 19:10
The short distance from the objective lens to the object causes problems at high magnification. which of the following is the most serious? a. cleaning the object surface b. positioning the object c. reflection from the object surface. d. illumination of the object
Answers: 1
You know the right answer?
Consider a cmos inverter fabricated in a 65-nm cmos process for which vdd =1v, vtn =−vtp =0.35 v, an...
Questions
question
Mathematics, 28.10.2020 19:30
question
Social Studies, 28.10.2020 19:30
question
Mathematics, 28.10.2020 19:30
question
English, 28.10.2020 19:30
question
Spanish, 28.10.2020 19:30
Questions on the website: 13722360