subject
Engineering, 25.01.2020 20:31 youngboymark123

An air conditioning unit is to be provided for a restaurant shown in the figure below. the restaurant is situated on the first floor of the building. the floor and ceiling are of 11.25 cm rcc + 11.25 cm lime concrete with 1.25 cm plaster on the inside with mass = 450 kg/m3 oc. the temperature on the ground floor and second floor and adjoining storage kitchen and rest room
is kept 3 oc higher than the room design condition. the following servey data is available at 6pm the peak load time. 15pt outside design condition: 42.7oc dbt, 27.1oc wbt, wo = 16.1 gms/kg inside design condition: 26.7oc dbt, w = 11 gms/kg occupancy at peak load: 100 people seated, 12 employee – medium activity. lights: 6000 watts daily range: 16 oc wall construction: 22.5 cm brick wall + 1.25 cm plaster on both sides, dark color, u = 2.01 w/m2 k, mass = 500 kg/m2 outside temperature at 3 pm = 42.7 oc. fan motor = 2.2 kw. duct heat gain = 4% of internal sensible heat gain. ordinary glass is used with u = 6.02 w/m2 k. inside ventilation blind are used as a shading device. find out the capacity of the plant, and shf for restaurant. location: north (shaded

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
For the closed feedwater heater below, feedwater enters state 3 at a pressure of 2000 psia and temperature of 420 °f at a rate of ix10 ibhr. the feedwat extracted steam enters state 1 at a pressure of 1000 psia and enthalpy of 1500 btu/lbm. the extracted er leaves at an enthalpy of 528.7 btu/lbm steam leaves as a saturated liquid. (16) a) determine the mass flow rate of the extraction steam used to heat the feedwater (10) b) determine the terminal temperature difference of the closed feedwater heater
Answers: 3
question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
question
Engineering, 04.07.2019 18:20
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
question
Engineering, 04.07.2019 19:20
Asimple speed reducer is composed of 2 spur gears. the pinion gear has a pitch diameter of 0.75" and 36 teeth while the driven gear has a pitch diameter of 4.0" and 192 teeth. a)-what is the diametral pitch of each gear? b)-if an electric motor rotating ccw at 3000 rpm is coupled to the pinion, what is the rotational speed of the driven gear? c)-if the torque delivered to the pinion is 1 n-m, what is the torque on the driven gear? d)-what is the power transmitted by the gear train?
Answers: 1
You know the right answer?
An air conditioning unit is to be provided for a restaurant shown in the figure below. the restauran...
Questions
question
Mathematics, 09.03.2021 07:20
question
Mathematics, 09.03.2021 07:20
question
Mathematics, 09.03.2021 07:20
Questions on the website: 13722361