subject
Engineering, 12.02.2020 01:23 luzperez2001

A mason requires 12 mason-hours per 100 ft2 for the bottom 4 ft of wall, and a hod carrier requires 14.5 helper hours to mix the mortar and carry mortar and brick to the masons. The masons lay the brick, square and tool the joints, and clean up at the end of the day. Wages for the mason and helper are $22.50 and $13.50 per hour. Find the cost per square foot.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
question
Engineering, 04.07.2019 18:10
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
question
Engineering, 04.07.2019 18:10
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
You know the right answer?
A mason requires 12 mason-hours per 100 ft2 for the bottom 4 ft of wall, and a hod carrier requires...
Questions
question
Chemistry, 01.05.2021 02:20
question
Mathematics, 01.05.2021 02:20
Questions on the website: 13722362