subject
Engineering, 14.02.2020 05:28 spiritcampbell56

A four-lane highway has a normal capacity of 1800 veh/hr/lane. In the southbound direction, a vehicle disablement on the roadway shoulder occurs at 4:30pm. Due to rubbernecking, the capacity in the southbound direction is reduced to 1200 veh/hr/lane at this time. At 4:45 pm, the disabled vehicle is removed from the shoulder and the capacity increases to 1500 veh/hr/lane. At 5:00pm the roadway capacity returns to its full value of 1800 veh/hr/lane. From 4:30pm until the queue clears the traffic flow is 1600 veh/hr/lane. Determine the following1. Average delay per vehicle2. Max queue length3. Average queue length in the southbound direction

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
question
Engineering, 04.07.2019 18:10
The flow rate of air through a through a pipe is 0.02 m5/s. a pitot static tube is placed in the flow. the radius of the pitot static tube is 1 mm. assuming the flow to be steady and the air to be at 300k, calculate the difference in total and static pressure if the diameter of the pipe is: (a) d 0.1 m d 0.05 m (c) d 0.01 m
Answers: 2
You know the right answer?
A four-lane highway has a normal capacity of 1800 veh/hr/lane. In the southbound direction, a vehicl...
Questions
Questions on the website: 13722359