subject
Engineering, 14.02.2020 17:10 AlexGaming1822

Write a program that reads a month number (1 for January, 12 for December) and the day number and displays thedate afterxdays, entered by the user. For simplicity, assume that each month has 30 days except for February thatalways counts for 28 days

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 04.07.2019 18:10
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
You know the right answer?
Write a program that reads a month number (1 for January, 12 for December) and the day number and di...
Questions
question
Mathematics, 09.04.2020 02:03
question
Mathematics, 09.04.2020 02:03
Questions on the website: 13722361