subject
Engineering, 14.02.2020 21:33 osuigwewhitney487

To practice my skills, Jesse asked me to create an imaginary project with at least 12 tasks, which include dependent, multiple predecessor, and multiple successor tasks. She wants me to create a list showing the tasks and dependencies. She also needs to know the duration, start, and finish for each task. She said to use my best guess regarding duration, and we could adjust it later.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 23:20
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
question
Engineering, 04.07.2019 18:20
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
You know the right answer?
To practice my skills, Jesse asked me to create an imaginary project with at least 12 tasks, which i...
Questions
question
English, 08.10.2019 18:30
question
History, 08.10.2019 18:30
Questions on the website: 13722363