subject
Engineering, 15.02.2020 00:12 rell5911

Desjarlais Corporation uses the following activity rates from its activity-based costing to assign overhead costs to products. (Do not round intermediate calculations. Round your final answers to 2 decimal places.) Activity Cost Pools Setting up batches Assembling products Processing customer orders Activity Rate $95.45 per batch $ 8.75 per assembly hour $51.38 per customer order Data concerning two products appear below: Product Product S960 006F 37 895 20 39 Number of batches Number of assembly hours Number of customer orders 46 177 Required: a. How much overhead cost would be assigned to Product S96U using the company's activity-based costing system? b. How much overhead cost would be assigned to Product QO6F using the company's activity-based costing system? Overhead cost a. Product S96U b. Product Q06F The controller of Hendershot Corporation estimates the amount of materials handling overhead cost that should be allocated to the company's two products using the data that are given below: Wall Specialty Mirrors Windows 13,400 1,320 1,340 1,220 Total expected units produced Total expected material moves Expected direct labor-hours per unit The total materials handling cost for the year is expected to be $16,652.90. If the materials handling cost is allocated on the basis of material moves, the total materials handling cost allocated to the specialty windows is closest to: (Round your intermediate calculations to 4 decimal places.) Multiple Choice $1,928 o o $7,936

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:20
An engine runs on the ideal diesel cycle. the cycle has a compression ratio of 20 and a cutoff ratio of 2. the highest temperature in the cycle is 1200 k. if the heat into the system is 300 kj/kg of working fluid and using variable specific heats determine the work produced per mass of working fluid
Answers: 3
question
Engineering, 04.07.2019 18:20
Find the minimum film thickness for a journal bearing with the data below. shaft diameter, d-50 mm, clearance ratio, cdratio? 0.001, shaft speed, n 2000 rpm; bearing length. i 200 mm; eccentricity ration, ? -0.55. ( note, cdratio-ca/d) the minimum film thickness is um
Answers: 2
You know the right answer?
Desjarlais Corporation uses the following activity rates from its activity-based costing to assign o...
Questions
question
English, 20.10.2020 22:01
question
English, 20.10.2020 22:01
question
Mathematics, 20.10.2020 22:01
question
Social Studies, 20.10.2020 22:01
Questions on the website: 13722363