subject
Engineering, 22.02.2020 05:48 moorealexis819owh9lb

You have a database named DB1 that is configured to use the full recovery model. Youhave a full daily backup job that runs at 02:00. The job backs up data from DB1 to the fileB:\DB1.bak. You need to restore the DB1 database to the point in time of May 25, 2016 at 02:23 andensure that the database is functional and starts to accept connections. Which Transact-SQL statement should you run?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
question
Engineering, 04.07.2019 18:10
Awall of 0.5m thickness is to be constructed from a material which has average thermal conductivity of 1.4 w/mk. the wall is to be insulated with a material having an average thermal conductivity of 0.35 w/mk so that heat loss per square meter shall not exceed 1450 w. assume inner wall surface temperature of 1200Β°c and outer surface temperature of the insulation to be 15Β°c. calculate the thickness of insulation required.
Answers: 3
question
Engineering, 04.07.2019 19:20
Determine the time of the day and month of the year at which the peak sensible cooling load occurs for a top floor, north-eastern corner room of an office building in durban for the following conditions: floor area: 8 x 8 x 3 m east and north walls: 115 mm face brick (outside), 20 mm air space, 115 mm ordinary brick (inside) with 15 mm plaster roof construction: suspended plasterboard ceiling, 450 mm air space, 150 mm concrete, 75mm screed, waterproofing no heat transfer across other surfaces window area 3x 1,5 m high in north wall only. ordinary glass with venetian blinds. lights and occupants : from 07: 00 to 18: 00 average light density: 25 w/m2 number of occupants : 5 seated, light office work room temperature 24Β°c
Answers: 3
You know the right answer?
You have a database named DB1 that is configured to use the full recovery model. Youhave a full dail...
Questions
question
Physics, 04.12.2019 12:31
question
Mathematics, 04.12.2019 12:31
question
Mathematics, 04.12.2019 12:31
question
Mathematics, 04.12.2019 12:31
question
Mathematics, 04.12.2019 12:31
question
Mathematics, 04.12.2019 12:31
question
Biology, 04.12.2019 12:31
Questions on the website: 13722363