Part A is produced on machine 1 and then machine 2. One unit of Part A is assembled with three units of Part B, which is produced on machine 3, in assembly station 4. Machine 1 has a scrap factor of 20%, and machine 2 has a scrap factor of 10%. The assembly process has a scrap factor of 15%. Another part, Part C, is produced on machine 5 and has a scrap estimate of 25%. Part C and the subassembly comprison of Part A and Part B are assembled at assembly station 6 into the completed product. Each day, 15,000 units of the completed product are required to meet demand. Assuming that machine 3 and assembly station 6 have scrap factors of 30% each, what are the requirements for Parts A, B, and C in order to meet the daily demand for the completed product?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
question
Engineering, 04.07.2019 18:10
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
question
Engineering, 04.07.2019 19:10
What is creep? what is stress relaxation?
Answers: 1
question
Engineering, 04.07.2019 19:10
An engine, weighing 3000 n, is supported on a pedestal mount. it has been observed that the engine induces vibration into the surrounding area through its pedestal at the maximum operating speed. determine the stiffness of the dynamic vibration absorber spring in (n/m) that will reduce the vibration when mounted on the pedestal. the magnitude of the exciting force is 250 n, and the amplitude of motion of the auxiliary mass is to be limited to 2 mm note: in this question type-in right numbers, no decimals, no fractions, no unit. approximate to right number if needed
Answers: 3
You know the right answer?
Part A is produced on machine 1 and then machine 2. One unit of Part A is assembled with three units...
Questions
question
Mathematics, 05.10.2019 00:10
Questions on the website: 13722361