The total construction of a sewage treatment plant with a capacity of 50 million gallons per day completed 2013 in Wichita, Kansas was $6.5 million. It was proposed that a similar treatment plant with a capacity of 80 million gallons per day be built in Los Angeles, California, for completion in 2020. For the additional information given below, perform an prder of magnitude estimate of the cost of the proposed plant using the following steps in order:

a) In the total construction cost for the Wichita, Kansas plant, there was an item of $0.5 million for site preparation which is not typical for similar plants
b) The variation of sizes of the refineries can be approximated by the cost capacity factor with m=0.6
c) The inflation rate is expected to be 5% per year from 2011 to 2021
d) The location index is 0.84 for Wichita, Kansas and 1.04 for Los Angeles. These indices are deemed to be appropriate for adjusting thee costs between these two cities
e) New air pollution equipment for the Los Angeles plant costs $0.7 million in 2020 (not required in the Wichita plant)
f) The contingency cost due to inclement weather delay will be reduced by the amount of 1% of total construction cost because of the favorable climate in Los Angeles (compared to Wichita)

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 19:30
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:20
Select any two (2) areas of applications of chain-drive. (clo4) a)-permanent lubrication necessary b)-hydraulic forklift truck operation c)-rigging and heavy moving materials d)-relatively high maintenance costs e)-costlier than belt drives
Answers: 2
question
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
You know the right answer?
The total construction of a sewage treatment plant with a capacity of 50 million gallons per day com...
Questions
question
Mathematics, 02.11.2020 07:40
question
Mathematics, 02.11.2020 07:50
Questions on the website: 13722363