A liquid feed of A and B, with initial parameters of 2000 L/min flow, 50 mol/L of A, and 25 mol/L of B, will be converted to liquid product J in a plug flow reactor that is operating under isothermal, isobaric, and constant liquid density conditions at all times. The reaction is represented by 0.4 A + B ? J The rate of destruction of A, in units of mol L min , is first order with respect to A, half (0.5) order with respect to B, and the rate constant is 10 L0.5 mol0.5 min1. Estimate the plug flow reactor volume, in liters, that is needed to achieve a conversion of 99% of the limiting reactant to liquid product. Express your answer as an integer, i. e. 123.57 would be input as 124. Hints: Determine the limiting reactant. It may help to re-express your reaction so that 1 mole of the limiting reactant is reacting, if the reaction is not already set up in this fashion. Remember the design equation for a PFR, and express the equation in terms of the limiting reactant- this includes using the rate of reaction of the limiting reactant. Develop a stoichiometric table. Remember the definition of concentration for a flowing reactor.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:10
Water at 70Β°f and streams enter the mixing chamber at the same mass flow rate, determine the temperature and the quality of the exiting stream. 0 psia is heated in a chamber by mixing it with saturated water vapor at 20 psia. if both streams enters the mixing chamber at the same mass flow rate, determine the temperature and the quality of the existing system.
Answers: 2
question
Engineering, 04.07.2019 19:10
How to increase the thermal officiency of an ideal simple rankino cycle? among these methods, which one is the best and why?
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
A liquid feed of A and B, with initial parameters of 2000 L/min flow, 50 mol/L of A, and 25 mol/L of...
Questions
question
Mathematics, 21.08.2020 17:01
question
Mathematics, 21.08.2020 17:01
question
Mathematics, 21.08.2020 17:01
Questions on the website: 13722363