subject
Engineering, 02.03.2020 17:17 michaelsmith710

Results of a standard compaction test (mold volume 943.9 cm3 ) are: Trial No. 1 Mass of soil + mold 5619 g Mass of mold 3735 g Water content test Mass of sample + container 288.26 g Mass of dry sample + container 265.39 g Mass of container 104.31 g Trial No. 2 Dry density 1795 kg/m3 w=14.9% Trial No. 3 Dry density 1828 kg/m3 w=15.6% Trial No. 4 Dry density 1832 kg/m3 w=16.5% Trial No. 5 Dry density 1796 kg/m3 w=17.6% Complete the calculations for trial No. 1. Draw the moisture-density curve using Excel or other spreadsheet programs. Include ZAV curves at w=16%, 17%, and 18%. (The relative density of the soil is 2.65.) Find the maximum dry density and the optimum water content.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed.gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
question
Engineering, 04.07.2019 19:10
The sum of the normal stresses does not change as the stress state rotates through an angle. a)-trune b)- false
Answers: 2
You know the right answer?
Results of a standard compaction test (mold volume 943.9 cm3 ) are: Trial No. 1 Mass of soil + mold...
Questions
question
Chemistry, 20.02.2022 08:50
Questions on the website: 13722362