subject
Engineering, 03.03.2020 02:58 wolffee895

Consider a 20 * 105 m3 lake fed by a polluted stream having a flow rate of 4.2 m3/s and pollutant concentration equal to 25 mg/L and fed by a sewage outfall that discharges 0.5 m3/s of wastewater having a pollutant concentration of 275 mg/L. The stream and sewage wastes have a second order decay rate of 0.32 L/(mg-day). Assuming the pollutant is completely mixed in the lake and assuming no evaporation or other water losses or gains, find the steady-state pollutant concentration in the lake. Derive the equation from the mass balance on C in the lake for full credit. Note that the quadratic equation will be useful for solving this problem.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 19:10
Asteam is contained in a rigid tank with a volume of 1 m3. initially, the pressure and temperature are 7 bar and 500 oc, respectively. the temperature drops due to cooling process. determine: (1) the temperature at which condensation begins in °c, (2) the fraction of the total mass that has condensed when the pressure decreased to 0.5 bar. (3) the volume in m3 occupied by saturated liquid at the final state?
Answers: 3
question
Engineering, 04.07.2019 19:10
Apressure vessel with an r/t 20 cannot be treated as thin walled vessel. a)-trune b)- false
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
question
Engineering, 04.07.2019 19:20
Liquid flows at steady state at a rate of 2 lb/'s through a pump, which operates to raise the elevation of the liquid 100 ft from control volume inlet to exit. the liquid specific enthalpy at the inlet is 40.09 btu/lb and at the exit is 40.94 btub. the pump requires 3 btu/s of power to operate. if kinetic energy effects are negligible and gravitational acceleration is 32.174 tt/s, the heat transfer rate associated with this steady state process is most closely 1)-2,02 btu/s from the liquid to the surroundings 2)-3.98 btu/s from the surroundings to the liquid. 3)-4.96 btu/s from the surroundings to the liquid. 4)-1.04 btu/s from the liquid to the surroundings.
Answers: 2
You know the right answer?
Consider a 20 * 105 m3 lake fed by a polluted stream having a flow rate of 4.2 m3/s and pollutant co...
Questions
question
English, 11.09.2020 02:01
question
Mathematics, 11.09.2020 02:01
question
Mathematics, 11.09.2020 02:01
question
Biology, 11.09.2020 02:01
question
Mathematics, 11.09.2020 02:01
question
Mathematics, 11.09.2020 02:01
question
Mathematics, 11.09.2020 02:01
question
Mathematics, 11.09.2020 02:01
question
Mathematics, 11.09.2020 02:01
question
Mathematics, 11.09.2020 02:01
question
Mathematics, 11.09.2020 02:01
question
Mathematics, 11.09.2020 02:01
question
Mathematics, 11.09.2020 02:01
question
Mathematics, 11.09.2020 02:01
question
English, 11.09.2020 02:01
question
Mathematics, 11.09.2020 02:01
question
Mathematics, 11.09.2020 02:01
question
Mathematics, 11.09.2020 02:01
question
Geography, 11.09.2020 02:01
question
Mathematics, 11.09.2020 02:01
Questions on the website: 13722363