Why might construction crews want to install pipes before the foundation is poured
A. Pipes form an important component of the structural integrity of a foundation.
B. All utilities, including electrical and HVAC, are installed before the foundation is laid.
C. Plumbing must feed into municipal water and sewer lines buried below the foundation.
D. Plumbing crews are more expensive than concrete masons; therefore it is cheaper if they do their work first.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afull journal bearing has a journal diameter of 27 mm, with a unilateral tolerance of -0.028 mm. the bushing bore has a diameter of 27.028 mm and a unilateral tolerance of 0.04 mm. the l/d ratio is 0.5. the load is 1.3 kn and the journal runs at 1200 rev/min. if the average viscosity is 50 mpa-s, find the minimum film thickness, the power loss, and the side flow for the minimum clearance assembly.
Answers: 1
question
Engineering, 04.07.2019 18:10
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
question
Engineering, 04.07.2019 18:10
Water at 55c flows across a flat plate whose surface temperature is held constant at 95c. if the temperature gradient at the plate's surface for a given value of x is 18 c/mm, find a) local heat transfer coefficient. b) heat flux
Answers: 3
question
Engineering, 04.07.2019 18:10
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
You know the right answer?
Why might construction crews want to install pipes before the foundation is poured
A. Pipes fo...
Questions
question
Biology, 23.05.2020 20:00
Questions on the website: 13722361