subject
Engineering, 06.03.2020 15:24 pennygillbert

5.Consider a pipeline of N stages in which stage i takes time ti. Assuming no delay between stages, what is the total time (start to finish) that the pipeline will spend handling a single instruction?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 03.07.2019 19:30
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
question
Engineering, 04.07.2019 18:10
Compute the pressure drop of 30°c air flowing with a mean velocity of 8 m/s in a circular sheet-metal duct 300 mm in diameter and 15 m long. use a friction factor, f 0.02, and pair = 1.1644 kg/m a. 37.26 pa b. 25.27 pa n c. 29.34 pa d. 30.52 pa
Answers: 1
You know the right answer?
5.Consider a pipeline of N stages in which stage i takes time ti. Assuming no delay between stages,...
Questions
question
Mathematics, 05.02.2021 14:50
question
Mathematics, 05.02.2021 14:50
question
Physics, 05.02.2021 14:50
question
Mathematics, 05.02.2021 14:50
question
Health, 05.02.2021 14:50
question
Chemistry, 05.02.2021 14:50
Questions on the website: 13722367