Engineering, 06.03.2020 21:58 mzyjohnson47

A machine center with 5 stations has two categories of downtime: machine jams from defective components and electro-mechanical failures. All 5 stations have a fraction defect rate of .025 with a probability of a jam being .25. Each jam takes 2 minutes to fix before the machine can run again. For electro-mechanical failures, the machine center has a failure rate of 0.05 and downtime for these issues require an average of 5 minutes to fix the problem. The ideal cycle time is 30 seconds. a. What is the hourly production rate? b. What is proportion of acceptable product? C. What is the line efficiency?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
question
Engineering, 04.07.2019 18:10
Consider a large isothermal enclosure that is maintained at a uniform temperature of 2000 k. calculate the emissive power of the radiation that emerges from a small aperture on the enclosure surface. what is the wavelength ? , below which 10% of the emission is concentrated? what is the wavelength ? 2 above which 10% of the emission is concentrated? determine the wavelength at which maximum spectral emissive power occurs. what is the irradiation incident on a small object placed inside the enclosure?
Answers: 2
question
Engineering, 04.07.2019 18:10
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
question
Engineering, 04.07.2019 18:20
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
You know the right answer?
A machine center with 5 stations has two categories of downtime: machine jams from defective compone...
Questions
question
Mathematics, 19.08.2019 07:00
question
History, 19.08.2019 07:00
question
Mathematics, 19.08.2019 07:00
Questions on the website: 13722360