subject
Engineering, 12.03.2020 02:04 TheAndroid

How many hours should it take an articulated wheel loader equipped with a 4-yd^3 bucket to load 3000 yd^3 of gravel (average material)from a stockpile into rail cars if the average haul distance is 300 ft one way? The area is level with a rolling resistance factor of 120 lb/ton. Job efficiency is estimated at 50 min/h.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:10
The thermal expansion or contraction of a given metal is a function of the f a)-density b)-initial temperature c)- temperature difference d)- linear coefficient of thermal expansion e)- final temperature f)- original length
Answers: 2
question
Engineering, 04.07.2019 18:10
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
question
Engineering, 04.07.2019 18:10
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
You know the right answer?
How many hours should it take an articulated wheel loader equipped with a 4-yd^3 bucket to load 3000...
Questions
question
Mathematics, 25.10.2019 03:43
question
Mathematics, 25.10.2019 03:43
question
Mathematics, 25.10.2019 03:43
Questions on the website: 13722361