A 75-hp (shaft output) motor that has an efficiency of 91.0 percent is worn out and is to be replaced by a highefficiency motor that has an efficiency of 95.4 percent. The motor operates 4368 hours a year at a load factor of 0.75. Taking the cost of electricity to be $0.12/kWh, determine the amount of energy and money saved as a result of installing the highefficiency motor instead of the standard motor. Also, determine the simple payback period if the purchase prices of the standard and high-efficiency motors are $5449 and $5520, respectively.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:20
Determine the damped natural frequencies and the steady state response of a decoupled damped forced two degrees of freedom system. 10ä1 + 2q1 20q1 10 cos t; 10q2 +4q2 + 40q2 10 cos t
Answers: 3
question
Engineering, 04.07.2019 19:10
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
question
Engineering, 04.07.2019 19:10
A)-explain briefly the importance of standards in engineering design. b)- what is patent? c)-explain the relationship between these standards: b.s. and b.s.en d)- in engineering design concepts, types of loads and how they act are important factors. explain.
Answers: 3
You know the right answer?
A 75-hp (shaft output) motor that has an efficiency of 91.0 percent is worn out and is to be replace...
Questions
question
Mathematics, 30.04.2021 17:10
question
Mathematics, 30.04.2021 17:10
Questions on the website: 13722360