Engineering, 17.03.2020 04:41 antbanks3050

A round rotor generator delivers steady state power Pe = 0.5 p. u. to an infinite bus through a transmission line with Xl = 0.4 p. u. |Eg| = 1.8 p. u., V[infinity] = 1.00 p. u., H = 5 sec, Xd = Xq = 1.0 p. u. Neglect resistances. The generator experiences a bolted three phase fault at its terminals. Circuit breakers open to clear the fault, then successfully reclose six cycles (0.1 sec) later. Find the maximum value of the generator rotor angle Ξ΄. Neglect damping. Sketch the areas.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
You know the right answer?
A round rotor generator delivers steady state power Pe = 0.5 p. u. to an infinite bus through a tran...