subject
Engineering, 17.03.2020 05:06 mackenziepaige6525

A large tank is filled to capacity with 500 gallons of pure
water. Brine containing 2 pounds of salt per gallon is pumped
into the tank at a rate of 5 gal/min. The well-mixed solution is
pumped out a rate of 10 gal/min. Find the number A(t) of pounds
of salt in the tank at time t. When is the tank empty?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 23:20
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 16:10
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
You know the right answer?
A large tank is filled to capacity with 500 gallons of pure
water. Brine containing 2 pounds o...
Questions
question
Social Studies, 25.03.2021 16:50
question
Mathematics, 25.03.2021 16:50
question
Mathematics, 25.03.2021 16:50
question
Mathematics, 25.03.2021 16:50
Questions on the website: 13722359