The construction time for a bridge is weather dependent. The project is expected to take 150 days if the weather is dry and hot. If the weather is damp and cool, it is expected to take 350 days. Otherwise, it is expected to take 300 days. Historical data suggests that there is a 40% chance of cool damp weather and a 10% chance of hot dry weather. What is the expected completion time of the project? g

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:10
True or false (explain) (110)[111] is a slip system in bcc metals . the {111} family in fcc contains 8 planes. resolved shear stress (rss) in single crystals is just related to the applied stress. critical resolved shear stress (crss) in single crystal metals is direct proportional to the number of defects in the structure
Answers: 2
question
Engineering, 04.07.2019 19:10
Acircular aluminum shaft mounted in a journal is shown. the symmetric clearance gap between the shaft and journal is filled with sae 10w-30 oil at t 30Β°c. the shaft is caused to turn by the attached mass and cord. develop and solve a differential equation for the angular speed of the shaft as a function of time.
Answers: 2
question
Engineering, 05.07.2019 19:10
Tech a says never use a water hose to clean up dust after a repair. tech b says never use a floor scrubber to clean up dust after repairs. who is correct?
Answers: 1
You know the right answer?
The construction time for a bridge is weather dependent. The project is expected to take 150 days if...
Questions
question
Mathematics, 24.03.2020 01:05
question
English, 24.03.2020 01:07
question
Mathematics, 24.03.2020 01:07
Questions on the website: 13722361