Engineering, 25.03.2020 16:41 anamatiascamaja
Let us consider the builder pattern where Product has four possible parts Part1, Part2, Part3, and Part4 (all integer).Assume we have three concrete builders: ConcreteBuilder1, ConcreteBuilder2, and ConcreteBuilder3.ConcreteBuilder1 assigns 11, 12, 13, and 14 to Part1, Part2, Part 3, and Part4 respectively. ConcreteBuilder2 assigns 21, 22, 23, and 24 to Part1, Part2, Part 3, and Part4 respectively. ConcreteBuilder3 assigns 31, 32, 33, and 34 to Part1, Part2, Part3, and Part4 respectively.1) Give the UML diagram.2) Implement the UML class diagram given in 1 in Java.
Answers: 1
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
Engineering, 04.07.2019 18:20
For a gate width of 2 m into the paper, determine the force required to hold the gate abc at its location.
Answers: 1
Engineering, 06.07.2019 04:20
Derive the 2-d finite difference equation for a uniform grid for a node: a) at a plane surface with a uniform heat flux b) at an internal corner with convection
Answers: 1
Engineering, 06.07.2019 05:20
Apiston-cylinder containing steam at 700 kpa and 250°c undergoes a constant pressure process until the quality is 70%. determine per kilogram (a) the work done, (b) the heat transferred, (c) then change of internal energy, and (d) the change of enthalpy
Answers: 2
Let us consider the builder pattern where Product has four possible parts Part1, Part2, Part3, and P...
Chemistry, 20.05.2020 04:00
Computers and Technology, 20.05.2020 04:00
Mathematics, 20.05.2020 04:00
Biology, 20.05.2020 04:00
History, 20.05.2020 04:00
Mathematics, 20.05.2020 04:00
Mathematics, 20.05.2020 04:00
English, 20.05.2020 04:00
Spanish, 20.05.2020 04:00
Biology, 20.05.2020 04:00
Mathematics, 20.05.2020 04:00