subject
Engineering, 27.03.2020 03:25 bobthebattlebot

A slab milling operation is performed on the top surface of a steel rectangular workpiece 12.0 inlong by 2.5 in wide. The helical milling cutter, which has a 3.0 in diameter and ten teeth, is set upto overhang the width of the part on both sides. Cutting speed is 125 ft/min, feed is 0.006in/tooth, and depth of cut = 0.300 in. Determinea. the actual machining time to make one pass across the surface andb. the maximum metal removal rate during the cut. c. If an additional approach distance of 0.5 in is provided at the beginning of the pass (beforecutting begins), and an overtravel distance is provided at the end of the pass equal to thecutter radius plus 0.5 in, what is the duration of the feed motion.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Fluids at rest possess no flow energy. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
You know the right answer?
A slab milling operation is performed on the top surface of a steel rectangular workpiece 12.0 inlon...
Questions
question
Mathematics, 24.02.2020 08:23
question
Mathematics, 24.02.2020 08:23
question
Biology, 24.02.2020 08:23
question
Mathematics, 24.02.2020 08:24
question
Mathematics, 24.02.2020 08:24
Questions on the website: 13722363