Q1) An engineer is considering the 4 machines below for laboratory railway track testing. Using present worth analysis, which machine should be selected? MARR is 8% per year.
Estimates Machine A Machine B Machine C Machine D
Initial cost, $ -144,000 -130,000 -155,000 -94,000
AOC, $/year -10,000 -11,100 -15,000 -1,000
Salvage value, $ 2,500 0 5,000 4,400
Life, years 3 6 3 6

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
question
Engineering, 04.07.2019 18:20
Atank with constant volume contains 2.27 kg of a mixture of water phases (liquid-vapor). in the initial state the temperature and the quality are 127 Β°c and 0.6, respectively. the mixture is heated until the temperature of 160 oc is reached. illustrate the process in a t-v diagram. then, determine (1) the mass of the vapor in kg at the initial state, (2) the final pressure in kpa.
Answers: 3
question
Engineering, 04.07.2019 19:10
The proportional limit is always greater than the yield strength for a material. a)-trune b)- false
Answers: 3
You know the right answer?
Q1) An engineer is considering the 4 machines below for laboratory railway track testing. Using pres...
Questions
question
Mathematics, 13.10.2020 06:01
question
Computers and Technology, 13.10.2020 06:01
question
Mathematics, 13.10.2020 06:01
question
Mathematics, 13.10.2020 06:01
Questions on the website: 13722363