subject
Engineering, 07.04.2020 19:22 jamiria38

For the system in problem 4, suppose a main memory access requires 30ns, the page fault rate is .01%, it costs 12ms to access a page not in memory (this time includes the time necessary to transfer the page into memory, update the page table, and access the data). Also suppose a TLB hit requires 7ns, the cache miss rate is 3%, the TLB hit rate is 95%, a cache hit requires 15 ns. On a TLB or cache miss, the time required for access includes a TLB and/or cache update, but the access is not restarted. On a page fault, the page is fetched from disk, all updates are performed but the access is restarted . All references are sequential (no overlap, nothing done in parallel)

a.) Calculate the time for a TLB hit and a cache hit.

b.) Calculate the EAT (effective access time) for a TLB hit.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
question
Engineering, 04.07.2019 18:10
Air is to be cooled in the evaporator section of a refrigerator by passing it over a bank of 0.8-cm-outer-diameter and 0.4-m-long tubes inside which the refrigerant is evaporating at -20°c. air approaches the tube bank in the normal direction at 0°c and 1 atm with a mean velocity of 4 m/s. the tubes are arranged in-line with longitudinal and transverse pitches of sl- st 1.5 cm. there are 30 rows in the flow direction with 15 tubes in each row. determine (a) the refrigeration capacity of this system and (b) pressure drop across the tube bank. evaluate the air properties at an assumed mean temperature of -5°c and 1 atm. is this a good assumption?
Answers: 1
question
Engineering, 04.07.2019 18:10
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
For the system in problem 4, suppose a main memory access requires 30ns, the page fault rate is .01%...
Questions
question
Mathematics, 10.07.2019 07:30
Questions on the website: 13722367