subject
Engineering, 09.04.2020 00:57 boo050341

A programmer needs to understand sequencing to determine whether the order of steps will affect the outcome of the program.

True

False

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
question
Engineering, 04.07.2019 19:10
What is the chief metrological difference between measuring with a microscope and with an electronic comparator? a. the microscope is limited to small workpieces.a. the microscope is limited to small workpieces. c. the comparator can only examine one point on the workpiece. d. the microscope carries its own standard.
Answers: 1
question
Engineering, 04.07.2019 19:20
Air at a pressure of 1atm and a temperature of 40 c is in parallel flow over the top surface of a flat plate that is heated to a uniform temperature of 120 c. the plate has a length of 0.40m (in the flow direction) and a width of 0.15m. the reynolds number based on the plate length is 50, 000. what is the rate of heat transfer from the plate to the air? if the free stream velocity of the air is doubled and the pressure is increased to 10 atm what is the rate of heat transfer?
Answers: 2
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
A programmer needs to understand sequencing to determine whether the order of steps will affect the...
Questions
question
Mathematics, 07.12.2020 17:30
question
Chemistry, 07.12.2020 17:30
question
Mathematics, 07.12.2020 17:30
question
Mathematics, 07.12.2020 17:30
question
Mathematics, 07.12.2020 17:30
Questions on the website: 13722360