subject
Engineering, 10.04.2020 17:49 12bluestone

A vapor mixture contains benzene (C6H6) and 10.0 mole% toluene (C7H8) at 110°C and 1.00 atm. A continuous stream of this vapor mixture enters a separator at 15.0 mol/hr. The streams exiting the separator are at a dew point (90°C and 1.25 atm). The liquid and vapor leaving the separator can be considered in equilibrium. The vapor leaving the separator is then heated isobarically to 130°C.(a) Draw a process flow diagram, number the streams, and label the phase of each stream (solid, liquid, gas).(b) Calculate the flow rate (mol/hr) and mole fractions of the liquid that exits the separator.(c) Calculate the volumetric flow rate (m3/hr) at standard temperature and pressure (STP) conditions of the vapor stream that exits the heater.(d) An alternative solution could use the dew point pressure form of Raoult's law. Derive the expression for the vapor mole fraction of exiting benzene, and check the answer with the previous solution.(e) The separator breaks down making the process isobaric. Will the benzene composition of the liquid leaving the separtor increase, decrease, or stay the same?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Athin walled concentric tube exchanger is used to cool engine oil from 160°c to 60°c with water that is available at 25°c acting as a coolant. the oil and water flow rates are each at 2 kg/s, and the diameter of the inner tube is 0.5 m and the corresponding value of the overall heat transfer coefficient is 250 w/m2. oc. how long must the heat exchanger be to accomplish the desired cooling? cpwater=4.187 kj/kg-candcpengine el=2.035 kj/kg·°c, oil . 120]
Answers: 1
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
question
Engineering, 04.07.2019 19:10
An engine, weighing 3000 n, is supported on a pedestal mount. it has been observed that the engine induces vibration into the surrounding area through its pedestal at the maximum operating speed. determine the stiffness of the dynamic vibration absorber spring in (n/m) that will reduce the vibration when mounted on the pedestal. the magnitude of the exciting force is 250 n, and the amplitude of motion of the auxiliary mass is to be limited to 2 mm note: in this question type-in right numbers, no decimals, no fractions, no unit. approximate to right number if needed
Answers: 3
question
Engineering, 06.07.2019 02:30
A12 mm diameter shaft runs in a plain cylindrical bush 30 mm long that is located in an 18 mm diameter hole in a housing. the shaft-inner bush fit is h8 f and the outer bush-housing fit is h7-p6. make a fully cimensioned sketch of the bush with tolerances. find the maximum and minimum clearance or interference for both fits on the inner and outer diameters of the bush
Answers: 3
You know the right answer?
A vapor mixture contains benzene (C6H6) and 10.0 mole% toluene (C7H8) at 110°C and 1.00 atm. A conti...
Questions
question
Chemistry, 15.02.2022 14:00
Questions on the website: 13722359