subject
Engineering, 14.04.2020 18:34 nestergurl101

Concrete is required for a bridge deck in Chicago. A specified compressive strength, f’c, of 4,500 psi is required at 28 days using Type I cement. The design calls for a minimum of 2.5 in. of concrete cover over the reinforcing steel. The minimum spacing between steel reinforcement is 5 in. The concrete should be designed to overcome all the environmental conditions encountered in Chicago. Refer to Textbook Chapter 12 of PCA – Design and Control of Concrete Mixes. Use the absolute volume method to design the concrete mix per 1 cubic yard. The materials

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:20
Athin walled concentric tube exchanger is used to cool engine oil from 160°c to 60°c with water that is available at 25°c acting as a coolant. the oil and water flow rates are each at 2 kg/s, and the diameter of the inner tube is 0.5 m and the corresponding value of the overall heat transfer coefficient is 250 w/m2. oc. how long must the heat exchanger be to accomplish the desired cooling? cpwater=4.187 kj/kg-candcpengine el=2.035 kj/kg·°c, oil . 120]
Answers: 1
You know the right answer?
Concrete is required for a bridge deck in Chicago. A specified compressive strength, f’c, of 4,500 p...
Questions
Questions on the website: 13722367