A soil sample taken from a borrow pit has a natural void ratio of 1.15. The soil will be used for a highway project where a total of 100,000 m3 of soil is needed in its compacted state; its compacted void ratio is 0.73. How much volume has to be excavated from the borrow pit to meet the job requirements? (remember that compaction is the densification of a soil mass by expelling air)

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 19:30
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
question
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
You know the right answer?
A soil sample taken from a borrow pit has a natural void ratio of 1.15. The soil will be used for a...
Questions
question
Mathematics, 17.08.2020 22:01
question
Mathematics, 17.08.2020 22:01
question
Geography, 17.08.2020 22:01
question
Mathematics, 17.08.2020 22:01
question
Mathematics, 17.08.2020 22:01
question
Mathematics, 17.08.2020 22:01
Questions on the website: 13722367