(Construction Management Fundamental) Civ / Arch E
An excavator ($300/hour) with a 4 cubic yard bucket loads trucks ($200/hour each).Trucks carry 18 cubic yards. Each cycle of the excavator is 30 seconds (4 yd3 each 30
seconds). We can either load the truck full (18 yd3) in 5 cycles or partially full (16 yd3) in 4 cycles. Assume 100% productive (60 minutes/60 minutes)In either case, the truck takes 6.5 minutes to travel, dump and return.
a. Option 1: 5 cycles of the excavator, 18 yd3 in the truck.
i. Determine the number of trucks to balance the operation, to 1 decimal place
ii. Round the number of trucks up, determine the productivity in yd3/hour
iii. Determine the cost per hour (round to nearest dollar) and cost per cubic yard(round to nearest cent/yd3) to load and haul the soil.
b Option 2: 4 cycles of the excavator, 16 yd3 in the truck.
i. Determine the number of trucks to balance the operation, to 2 decimal places
ii. Round the number of trucks up, determine the productivity in yd3/hour
iii. Determine the cost per hour and cost per cubic yard to load and haul the soil
Answers: 3
Engineering, 03.07.2019 15:10
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
Engineering, 04.07.2019 18:10
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
Mathematics, 13.02.2021 14:00
Biology, 13.02.2021 14:00
Arts, 13.02.2021 14:00
Mathematics, 13.02.2021 14:00
Social Studies, 13.02.2021 14:00
Mathematics, 13.02.2021 14:00
Mathematics, 13.02.2021 14:00
Mathematics, 13.02.2021 14:00
Mathematics, 13.02.2021 14:00
Computers and Technology, 13.02.2021 14:00
Mathematics, 13.02.2021 14:00
Mathematics, 13.02.2021 14:00