subject
Engineering, 15.04.2020 18:22 thedragontale1020

Two production methods are being compared. One manual and the other automated. The manual method produces 10 pc per hour and requires one worker at $ 15.00 per hour. Fixed cost of the manual method is $ 5,000 per year. The automated method produces 25 pc per hour, has a fixed cost of $ 55,000 per year, and a variable cost of $ 4.50 per hour. Determine the Break โ€“ Even Point (BEP) for the two methods; that is, determine the annual production quantity at which the two methods have the same annual cost. Ignore the cost of material used in the two methods

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
question
Engineering, 04.07.2019 16:10
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
You know the right answer?
Two production methods are being compared. One manual and the other automated. The manual method pro...
Questions
Questions on the website: 13722359