The total cooling load for a building zone is 200,000 Btu/hr with a sensible heat ratio (SHR) of 0.8. The zone temperature is 74F. The supply air is at a temperature of 54F and a humidity ratio of 0.008 lbm/lbma. Determine (a) the supply airflow rate (cfm) and (b) zone relative humidity. (10 p

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 23:20
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
An ideal otto cycle with air as the working fluid has a compression ratio of 8. the minimum and maximum temperatures in the cycle are 300 k and 1340 k. use constant specific heats at room temperature to determine (a) the amount of heat transferred to the air during the heat- addition kj/kg, (b) the thermal efficiency, and (c) the thermal efficiency of a carnot cycle ope limits. process, in rating between the same temperature
Answers: 2
You know the right answer?
The total cooling load for a building zone is 200,000 Btu/hr with a sensible heat ratio (SHR) of 0.8...
Questions
question
Social Studies, 27.08.2020 21:01
question
English, 27.08.2020 21:01
Questions on the website: 13722367