We are given as input a set of n jobs, where job j has a processing time pj, a deadline dj. Given a schedule (i. e., an ordering of the jobs), consider that each job j has the completion time C; we define the lateness l of job j as the amount of time C - d, after its deadline that the job completes, or as 0 if C; < dj. Our goal is to minimize the maximum lateness, maxlj. Consider the following greedy rules for producing an ordering that minimizes the maximum lateness. For each rule, please explain why it gives the optimal ordering or give a counterexample. You can assume that all processing times and dead- lines are distinct. (a) Schedule the requests in increasing order of processing time Pj. (b) Schedule the requests in increasing order of the product d; * Pj. (c) Schedule the requests in increasing order of deadline di.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
question
Engineering, 04.07.2019 18:20
Water vapor initially at 10 bar and 400 °c is contained within a piston-cylinder assembly. the water lost heat to the surrounding according to isochoric (iso-volumetric) process until its temperature is 150 °c. the water is then condensed isothermally to saturated liquid. for the water as a system, calculate the work in kj/kg
Answers: 2
question
Engineering, 04.07.2019 19:10
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
question
Engineering, 04.07.2019 19:10
Asteel wire of 2 mm diameter is fixed between two points located 2 m apart. the tensile force in the wire is 250n, if its density of steel is given by 7830 kg/m3 the fundamental frequency of vibration hz? ?
Answers: 3
You know the right answer?
We are given as input a set of n jobs, where job j has a processing time pj, a deadline dj. Given a...
Questions
question
English, 26.07.2021 18:10
question
Biology, 26.07.2021 18:10
question
Mathematics, 26.07.2021 18:10
question
Mathematics, 26.07.2021 18:10
question
Mathematics, 26.07.2021 18:10
question
Mathematics, 26.07.2021 18:10
Questions on the website: 13722359