A masonry facade consisting of 3,800 square feet is to be constructed for a building. The total cost per worker hour is estimated to be $31.50, and the total estimated cost of the labor for this task is $10,500. Assuming 8-hour work days and a crew of six workers, how many days should be allowed to complete this task? What is the production rate that the crew must attain to keep the project on schedule and within the budget?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 16:10
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
question
Engineering, 04.07.2019 18:10
The temperature of air decreases as it is compressed by an adiabatic compressor. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
You know the right answer?
A masonry facade consisting of 3,800 square feet is to be constructed for a building. The total cost...
Questions
question
Mathematics, 27.08.2021 20:20
question
Mathematics, 27.08.2021 20:20
Questions on the website: 13722367