MOD002665 Modelling and Simulation for Operations Management
Element 011: Time Constrained course work
As a replacement for the in-class test, you are required to complete this time constrained course work. This
course work is released one week before the deadline. You should submit your completed work in Turnitin by
the deadline.
he
Course work brief:
Enten
SIGHISONSOFT
HET
HPL
HOME
PER
FEB
18
WEBSITE
PG
Flexsym is an electronic circuit manufacturing company that makes printed circuit boards (PCBs) to
multinational companies. Their manufacturing process is described on next page. You are required to write a
report of around 1000 words on how their process could be modelled and their performance improved. As
you are not required to use Witness Horizon for this work, your report is expected to be based on describing
the concepts using the given information or data rather than using simulation results. Your report is expected
to include the following tasks:
SE
BE SISTE
SEE
FEEDERBI
Ka
ER!
DER EL
F
lora
LTD
LO
FERIE
TO
USE
SLI
ASES
A brief introduction on manufacturing simulation and why simulation is considered one of the most
effective tools for decision making in manufacturing.
(10 marks)
For the given Flexsym manufacturing system, produce a pseudo representation showing the routing and
the necessary data that would aid in building the simulation model.
(20 marks)
LE

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
question
Engineering, 04.07.2019 19:10
What is a monomer? how do they form a ploymer from the view point of chemical bonding?
Answers: 1
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
MOD002665 Modelling and Simulation for Operations Management
Element 011: Time Constrained cour...
Questions
question
Mathematics, 26.10.2020 22:20
question
English, 26.10.2020 22:20
Questions on the website: 13722361