Currently, the lost time of each stage is 4 seconds, and intersection critical v/c ratio is set to be 0.75 to avoid cycle failures caused by randomness of arrival traffic. Solve the following problems: 1) identify critical lane groups and solve their sum of flow ratios; 2) minimum cycle length and optimal cycle length; 3) Autonomous vehicle technologies make traffic movement at intersections more efficient. The lost time of each stage is reduced to 2 seconds, saturation headway is reduced by 10%. If the intersection demand does not change, calculate the critical v/c ratio corresponding to the minimum cycle length in 2).

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Two flowing streams of argon gas are adiabatically mixed to form a single flow/stream. one stream is 1.5 kg/s at 400 kpa and 200 c while the second stream is 2kg/s at 500 kpa and 100 ? . it is stated that the exit state of the mixed single flow of argon gas is 150 c and 300 kpa. assuming there is no work output or input during the mixing process, does this process violate either the first or the second law or both? explain and state all your assumptions.
Answers: 1
question
Engineering, 04.07.2019 18:10
Water at 55c flows across a flat plate whose surface temperature is held constant at 95c. if the temperature gradient at the plate's surface for a given value of x is 18 c/mm, find a) local heat transfer coefficient. b) heat flux
Answers: 3
question
Engineering, 04.07.2019 18:20
Determine the damped natural frequencies and the steady state response of a decoupled damped forced two degrees of freedom system. 10ä1 + 2q1 20q1 10 cos t; 10q2 +4q2 + 40q2 10 cos t
Answers: 3
question
Engineering, 04.07.2019 18:20
Air is compressed isentropically from an initial state of 300 k and 101 kpa to a final temperature of 1000 k. determine the final pressure using the following approaches: (a) approximate analysis (using properties at the average temperature) (b) exact analysis
Answers: 1
You know the right answer?
Currently, the lost time of each stage is 4 seconds, and intersection critical v/c ratio is set to b...