subject
Engineering, 21.05.2020 04:10 ummitsjustjae

A concrete batch calls for the following quantities per cubic yard of concrete, based on saturated surface-dry conditions of the aggregate. Determine the required weights of each solid ingredient and the number of gallons of water required for a 6.5-cy batch. Also determine the wet unit weight of the concrete in pounds per cubic foot ( cement, 3,666 lbs; fine aggregate, 9,230 lbs; coarse aggregate, 11,960 lbs; water, 1,841 lbs; and wet unit weight, 152 pct).

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
question
Engineering, 04.07.2019 18:10
An ideal otto cycle with air as the working fluid has a compression ratio of 8. the minimum and maximum temperatures in the cycle are 300 k and 1340 k. use constant specific heats at room temperature to determine (a) the amount of heat transferred to the air during the heat- addition kj/kg, (b) the thermal efficiency, and (c) the thermal efficiency of a carnot cycle ope limits. process, in rating between the same temperature
Answers: 2
question
Engineering, 04.07.2019 19:10
Asteam is contained in a rigid tank with a volume of 1 m3. initially, the pressure and temperature are 7 bar and 500 oc, respectively. the temperature drops due to cooling process. determine: (1) the temperature at which condensation begins in °c, (2) the fraction of the total mass that has condensed when the pressure decreased to 0.5 bar. (3) the volume in m3 occupied by saturated liquid at the final state?
Answers: 3
question
Engineering, 04.07.2019 19:10
Analyze the factors that influence the choice between the following pairs of processes to make the products indicated: i) sand casting versus die casting of an electric-motor housing ii) thread rolling versus machining of a bolt for high-strength application. (co3/c5)
Answers: 3
You know the right answer?
A concrete batch calls for the following quantities per cubic yard of concrete, based on saturated s...
Questions
Questions on the website: 13722367