subject
Engineering, 04.06.2020 14:04 annajquinterov

One metric for measuring requirements specification is “Correctness”. The correctness factor Cr can be calculated by Cr=R_c/(R_c+R_nv ), where R_c is the number of correct requirements and R_nv is the number of still not valid requirements. The metric Cr is used to measure percentage of requirements in the SRS that have been validated. What is the Cr of your workgroup project specification. Justify your answer.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
question
Engineering, 04.07.2019 18:10
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
You know the right answer?
One metric for measuring requirements specification is “Correctness”. The correctness factor Cr can...
Questions
question
Biology, 26.03.2021 01:30
question
Mathematics, 26.03.2021 01:30
Questions on the website: 13722362