subject
Engineering, 13.06.2020 19:57 gtamods402

he tower crane is used to hoist the 1.8-Mg load upward at constant velocity. The 2-Mg jib BD, 0.6-Mg jib BC, and 5.5-Mg counterweight C have centers of mass at G1, G2, and G3, respectively. Determine the resultant moment in kN·m produced by the load and the weights of the tower crane jibs about point A. ( in kN. m and assume counterclock wise as positive, clockwise as negative)

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Refrigerant 134a enters an insulated compressor operating at steady state as saturated vapor at -26°c with a volumetric flow rate of 0.18 m3/s. refrigerant exits at 9 bar, 70°c. changes in kinetic and potential energy from inlet to exit can be ignored. determine the volumetric flow rate at the exit, in m3/s, and the compressor power, in kw.
Answers: 1
question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:20
Determine the damped natural frequencies and the steady state response of a decoupled damped forced two degrees of freedom system. 10ä1 + 2q1 20q1 10 cos t; 10q2 +4q2 + 40q2 10 cos t
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
he tower crane is used to hoist the 1.8-Mg load upward at constant velocity. The 2-Mg jib BD, 0.6-Mg...
Questions
question
Mathematics, 04.12.2020 02:40
question
Mathematics, 04.12.2020 02:40
question
Mathematics, 04.12.2020 02:40
question
Biology, 04.12.2020 02:40
question
Mathematics, 04.12.2020 02:40
Questions on the website: 13722359